Today Kevin organised the delivery and installation of 14 cubic metres of self-levelling concrete - that's 120 square metres of floor in total.
We brought the concrete in through the doors and a window.
 |
Kevin supervises the chute positioning |
 |
The first of eight cubic metres of concrete is delivered into the main barn |
 |
Delivery Lorry in position |
 |
All hands to the pump to rake out the concrete - From left Kevin, Tim, Keith and Adam |
 |
Adam performs the final float levelling of the cement |
 |
The finished floor is poured and level |