Today Kevin organised the delivery and installation of 14 cubic metres of self-levelling concrete - that's 120 square metres of floor in total.
We brought the concrete in through the doors and a window.
 |
| Kevin supervises the chute positioning |
 |
| The first of eight cubic metres of concrete is delivered into the main barn |
 |
| Delivery Lorry in position |
 |
| All hands to the pump to rake out the concrete - From left Kevin, Tim, Keith and Adam |
 |
| Adam performs the final float levelling of the cement |
 |
| The finished floor is poured and level |